AmerAir International, is a global expert in air pollution control with over 40 years of experience providing state of the art, turn-key solutions for all kind of air pollution needs internationally. Our capabilities include design, engineering, supply, manufacturing, installation, operation and maintenance of various kinds of air & odor pollution control systems in water, wastewater and industrial sectors.
Our team of engineers can offer complete range of solutions including biological filtration and carbon adsorption, chemical wet scrubbers, regenerative thermal oxidizers, de-gasifiers, venturi scrubbers, cyclones and various types of bag-houses. Additionally, we represent major suppliers for pumps, fans and other peripheral equipment utilized in our system designs.
Outstanding Regional Odor Control Systems supplied by Amerair International
Project:
Wathba STP2 (Sludge Collecting Box), Odor Control System
Location: UAE-Abu Dhabi
Capacity: 6000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation for:
- Odor Control Unit (1 Carbon Scr.)
Year: 2011
Project:
Jumeira Golf Estate STP, Odor Control System
Location: UAE-Dubai
Capacity: 25000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation for:
- Odor Control Unit(1 Chemical Scrubber)
- Ducting system
Year: 2009
Project:
Pumping Station S, Odor Control System
Location: UAE-Dubai
Capacity: 3500 m3/hr
Scope of Supply:
Engineering,Procurement and Installation for:
- Odor Control Unit(1 Bio Scrubber)
- Ducting system
Year: 2009
Project:
Sharjah STP Phase 7, Odor Control System
Location: UAE-Sharjah
Capacity: 40000 m3/hr & 6500 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervision for:
- Ducting system
Year: 2008
Project:
Al Saja‘a STP, Odor Control System
Location: UAE-Sharjah
Capacity: 37500 m3/hr
Scope of Supply:
Engineering:
- Ducting system
Year: 2009
Project:
Wathba STP1, Odor Control System
Location: UAE-Abu Dhabi
Capacity: 30000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervision for:
- Odor Control Unit (6 Chemical Scr.)
- Ducting system
Year: 2010
Project:
Wathba STP2 (Sludge Collecting Box), Odor Control System
Location: UAE-Abu Dhabi
Capacity: 6000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation for:
- Odor Control Unit (1 Carbon Scr.)
Year: 2011
Project:
Wathba STP2 , Biological Odor Control System
Location: UAE-Abu Dhabi
Capacity: 6000~9000 m3/hr
Scope of Supply:
Engineering,Procurement of Biological Odor Control System with ventilation ducting system and installation
Year: 2012
Project:
Wathba STP2 , Chemical Scrubbing Odor Control System, Mist Eliminator Installation
Location: UAE-Abu Dhabi
Capacity: 140000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervision for:
- Mist Eliminators
- Washing system
Year: 2012
Project:
Razeen Labor City STP, Odor Control System
Location: UAE-Abu Dhabi
Capacity: 17500 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervision for:
- Odor Control Unit (2 Chemical Scr.)
- Ducting system
Year: 2012
Project:
Pumping Station C, Upgrading of Odor Control System
Location: UAE-Dubai
Capacity: 8500~11000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation for:
- Odor Control Unit (1 new Bio Scr.+ Chem. Scr. modification)
Year: 2012
Project:
Pumping Station E, Upgrading of Odor Control System
Location: UAE-Dubai
Capacity: 8500~11000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation for:
- Odor Control Unit (1 new Bio Scr.+ Chem. Scr. modification)
Year: 2012
Project:
Pumping Station G, Upgrading of Odor Control System
Location: UAE-Dubai
Capacity: 8500~11000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation for:
- Odor Control Unit (1 new Bio Scr.+ Chem. Scr. modification)
Year: 2012
Project:
Pumping Station S, Upgrading of Odor Control System
Location: UAE-Dubai
Capacity: 8500~11000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation for:
- Odor Control Unit (1 new Bio Scr.+ Chem. Scr. modification)
Year: 2012
Project:
Ajman WWTP, Emergency Chlorine Scrubber System
Location: UAE-Ajman
Capacity: 6000 m3/hr- 1 Ton
Scope of Supply:
Installation for:
- Chlorine Scrubber (2 stage Chem. Scr.)
- Ducting system
Year: 2012
Project:
Wathba STP2 , Upgrading of Odor Control System
Location: UAE-Abu Dhabi
Capacity: 140000 m3/hr
Scope of Supply:
Engineering for:
- Odor Control Unit (8 new Bio Scr.)
Year: 2013
Project:
Fujairah Medical Waste Incinerator, Air Pollution Control System
Location: UAE-Fujairah
Capacity: 2500 m3/hr
Scope of Supply:
Engineering,Procurement and Installation for:
- APCS (Quench, Venturi Scr. and Chem. Scr.)
Year: 2013
Project:
Dubai Airport Hangars Sewage Lifting Station, Odor Control Unit
Location: UAE-Dubai
Capacity: 2000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervision for:
- Odor Control Unit (1 Carbon Scr.)
Year: 2013
Project:
Mafreq WWTP, Odor Control Ducting Refurbishment
Location: UAE-Abu Dhabi
Capacity: 38900,32300,32300 & 12100 m3/hr
Scope of Supply:
Engineering for:
- Ducting Replacement
- Supports Installation
Year: 2013
Project:
Ardiya STP, Odor Control System Modification
Location: Kuwait
Capacity: 48000 m3/hr
Scope of Supply:
Installation Supervision for:
- Increasing the capacity of Odor Control Unit from 40000 to 48000m3/hr
- Modifying the ducting system
Year: 2007
Project:
Ardiya STP Biosystem, Odor Control System
Location: Kuwait
Capacity: 1000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervision for:
- Odor Control Unit (1 Bio Scrubber)
- Ducting system
Year: 2008
Project:
Egaila Pumping Station, Odor Control System
Location: Kuwait
Capacity: 300000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervision for:
- Odor Control Unit (4 Chem. Scr.+ 8 Carbon Scr.)
- Ducting system
Year: 2010
Project:
Rub Alkhali STP, Odor Control System
Location: Oman
Capacity: 1030 m3/hr
Scope of Supply:
Engineering,Procurement and Installation for:
- Odor Control Unit (1 Carbon Scr.)
Year: 2014
Project:
APC WWTP, Odor Control System
Capacity: 37000 m3/hr
Scope of Supply:
Engineering for:
- Odor Control Unit (Thermal Oxidizer)
- Ducting system
Year: 2013
Project:
PI, Pilot Odor-VOC Control Unit
Capacity: 250 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervision for:
- Odor Control Unit (1 Bio Scr.)
Year: 2013
Project:
PI, Pilot Odor-VOC Control Unit
Capacity: 260 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervision for:
- Odor Control Unit (1 Chem Scr.)
Year: 2013
Project:
WWTP, Odor Control System
Capacity: 16700 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervisionfor:
- Odor Control Unit (1 Bio Scr.)
Year: 2014
Project:
TPC Petrochemical Plant Watewater Treatment Unit, VOCs Removal System
Capacity: 16,600 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervisionfor:
- Covering DAF, API,etc Ductwork Regenerative Termal Oxidizer
Performance:
3000 mg/m3 VOC Inlet 98% Destruction Removal Efficiency
Year: Installation/Commissioning:2019/2020
Project:
Copertino STP,Odor Control Units
Client: GECO
Location: Lecce - Italy
Capacity: 8,200 m3/hr, 12,800 m3/hr, 12,800 m3/hr & 23,900 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervisionfor:
- 5 Bio Trickling Filter
Year:Installation/Commissioning:2019/2021
Project: Osnago STP,Odor Control Unit
Client: Lario Reti Holding
Location: Milan- Italy
Capacity: 9,900 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervisionfor:
- 1 Bio Trickling Filter
Year:Installation/Commissioning:2019/2021
Project:Glenmark Regenerative Thermal Oxidizer, Flue Gas Treatment
Location:North Carlonia-USA
Capacity: 27,000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervisionfor:
- 1 Quench
- 1 Vertical Chemical Scrubber
Performance:
315 ppm HCl Inlet 99% Removal Efficiency
Year: Installation/Commissioning:2019/2019
Project:
Bahrain City Center SWROP, Desulfurization System
Location:Manama-Bahrain
Capacity: Liquid: 110 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervisionfor:
- 2 Vertical Degasifier
- 1 Vertical Bio-Ftr/Carb-Ftr
Performance:
Liquid: 99% @ 5ppm
Gas: 99.95% @ 400ppm
Year: Installation/Commissioning:2020/2021
Project:
Diyar al Murraq PS,Odor Control Unit
Client: Almadar
Location: Manama-Bahrain
Capacity: 16,300 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervisionfor:
- 2 Chemical Scrubber followed by 1 Vertical Crabon Filter
Performance:
50~250 ppm H2S Inlet
99.9% Removal Efficiency
Year: Installation/Commissioning: 2018/2019
Project:
Dammam ISTP,Odor Control Unit
Client: Metito
Location: Dammam -KSA
Capacity: 30,000 m3/hr, 6,500 m3/hr, 7,000 m3/hr & 20,000 m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervisionfor:
- 5 Vertical Bio Trickling Filter
- 5 Vertical Carbon Filter
Year: Installation/Commissioning: 2021/2022
Project:
Liwa MPS-Odor Control Unit
Client: Towell
Location: Liwa-Oman
Capacity: 10200m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervisionfor:
- 4 Vertical Bio Trickling Filters
- 2 Vertical Carbon Filters
Performance:
50 ppm H2S Inlet
99.9% Removal Efficiency
Year: Installation/Commissioning: 2015/2016
Project:
Jabal Akhtar STP-Odor Control Unit
Client: Al Ansari
Location: Nizwa-Oman
Capacity: 3900m3/hr
Scope of Supply:
Engineering,Procurement and Installation Supervisionfor:
- 1 Vertical Bio Trickling Filter
- 1 Vertical Carbon Filter
Performance:
50 ppm H2S Inlet
99.9% Removal Efficiency
Year: Installation/Commissioning: 2015/2016